We were awarded design and build for an immediate permanent building need for Tesla. This build was to cover their chemical gas transfer station at their Fremont, Ca manufacturing facility. This was a turnkey project where all work was self-performed including foundation, excavation, concrete work, structure manufacturing, and installation. We supported second tier subs that comprised fire suppression systems, electrical, and water.
The project was completed within the clients strict time constraints, as well as difficult working conditions presented by working around hazardous materials and existing infrastructure. Full California code and safety compliance were met.